Oct 24 (Reuters) - Jacobs Engineering Group Inc (NYSE:JEC) JEC.N :
* JACOBS SELECTED FOR COPPER CATHODE PRODUCTION FACILITY PRE-FEASIBILITY STUDY IN PERU
* JACOBS ENGINEERING - AS PER CONTRACT, CO WILL PROVIDE CAPEX AND OPERATING EXPENDITURE ESTIMATES TO TECK AND AURUBIS FOR DETERMINING PROJECT PRE-FEASIBILITY
* JACOBS ENGINEERING - CO SELECTED BY TECK RESOURCES LIMITED AND AURUBIS AG TO PERFORM PFS FOR A PROPOSED COPPER CATHODE PRODUCTION FACILITY IN PERU