Aecon Group Inc. (ARE)

13.00
-0.36(-2.69%)
  • Volume:
    147,943
  • Bid/Ask:
    12.99/13.01
  • Day's Range:
    12.97 - 13.40
  • Type:Equity
  • Market:Canada
  • ISIN:CA00762V1094
  • CUSIP:00762V109

ARE Overview

Prev. Close
13.36
Day's Range
12.97-13.4
Revenue
4.21B
Open
13.38
52 wk Range
12.97-22.28
EPS
0.64
Volume
147,943
Market Cap
790.83M
Dividend (Yield)
0.74
(5.54%)
Average Volume (3m)
237,986
P/E Ratio
20.96
Beta
0.98
1-Year Change
-25.15%
Shares Outstanding
60,926,437
Next Earnings Date
Jul 28, 2022
What is your sentiment on Aecon Group Inc.?
or
Vote to see community's results!

Aecon Group Inc. News

  • ARE SPREADS THE THIN EDGE OF THE WEDGE?
    • ByOil And Gas Investments-

    Everyone is an oil bull right now. In the last 6 days I’ve listened to Vitol Asia head Michael Muller, UAE Energy Minister Suhail Al-Mazrouei, and Trafigura CEO Jeremy Weir all...

  • Passive Income: Why Dividends ARE Relevant!
    • ByFool-

    Dividend Aristocrats like Fortis Inc (TSX:FTS)(NYSE:FTS) tend to have positive earnings. That makes them better than many stocks out there.The post Passive Income: Why Dividends...

  • ARE WE IN A REFINING GOLDEN AGE?
    • ByOil And Gas Investments-

    This is a Market with very few places to hide. All the favorites are getting killed.  You thought you could hide in consumer staples, in big tech?  Think again. With the world...

Aecon Group Inc. Analysis

Aecon Group Inc. Company Profile

Aecon Group Inc. Company Profile

Employees
5260
Market
Canada

Aecon Group Inc. (Aecon) is a Canada-based construction and infrastructure development company. Aecon and its subsidiaries provide services to private and public sector clients throughout Canada and worldwide. The Company operates in two segments within the infrastructure development industry: Construction and Concessions. Aecon’s projects include Annacis Island Wastewater Treatment Plant, Bow River Bridge Twinning, Coastal GasLink Pipeline, Comox Valley Water Treatment Plant, Darlington Nuclear Refurbishment, Eglinton Crosstown LRT, Eglinton Crosstown West Extension Advance Tunnel, Gordie Howe International Bridge, Highway 91/17 Upgrade project, Imperial's Waterdown to Finch project, Kicking Horse Canyon project, Nova Chemicals Area 100/200 Mechanical and Piping Installation project, Winnipeg North End Sewage Treatment Plant (NEWPCC), F.G. Gardiner Expressway Rehabilitation project, Highway 410 Widening, John Hart Generating Station Replacement project, and K+S Potash Legacy Mine.

Read More

Technical Summary

Type
5 Min
15 Min
Hourly
Daily
Monthly
Moving AveragesStrong SellStrong SellStrong SellStrong SellStrong Sell
Technical IndicatorsStrong SellStrong SellStrong SellStrong SellStrong Sell
SummaryStrong SellStrong SellStrong SellStrong SellStrong Sell